BATICO HAS BEEN FINISHING 70% SCOPE OF CONCRETING WORK OF THE 1ST FLOOR AND DEPLOYING THE COLUMN AND CONCRETE WORK FOR THE 2ND FLOOR

Wednesday 26-06-2019
The weather of this rainy season is one of the biggest priority concerns at site. At present, Batico 2 Factory has been deploying the important item of the project: performing Concrete work for the 1st and 2nd floor. Until now, concrete work for the 1st floor has finished 70% (equivalent to 3.360 m2), and now continue to effectuate 30% remaining. At the same time, Batico site team has been deploying the Column and Floor work for the 2nd floor, with the area reaching to 4.800 m2. 

Despite of the rainy weather, this project still response the initial schedule. Site is beautiful and clean that makes our Investor feel happy and believe in their choice. 
With CBC Construction, site with NO ACCIDENT is always our priority and that is the obligatory commitment to all of our clients.